Over 1200 tons of dirt & stone removed for storm water basins and replaced with over 2000 tons of rock and material, built a new driveway. Excavation, footers, 8 tons of rebar, concrete walls, 180 yards of concrete for the floor slab, structural steel erected, windows, doors, insulation and sheeting installed... insulation & roof sheeting began May 2nd... stay tuned!
![]()